Wyndham Ridge

Overview:

Construction of 248 lots at Wyndham Ridge Estate

Scope of work:

  • 66,000 cu.m of cut to fill
  • 41,000t of pavement construction
  • 4.4km of kerb & gutter
  • 3.6km of stormwater drainage
  • 3.2km of sewer main
  • 4.0km of watermain
  • 3.0km of service trenching (electrical, nbn and gas)

Highlights and challenges:

The construction works have encountered a significant amount of rock in both earthworks and trenching. This has required works to be flexible with multiple work areas to ensure productivity is maintained while removing the rock.